Following the redesign of the second-floor office layout and the construction of new meeting rooms, we successfully reconfigured the mechanical ventilation system to deliver optimal climate control and indoor air quality.
The project involved careful design coordination and adjustments to the localised heating and cooling units to ensure effective coverage across the entire space. Our team worked closely with the designer to survey and map the existing ductwork routes, allowing us to modify the system to suit the new layout.
Our manufacturing and installation teams then fabricated new ductwork, plenums, and grilles, while also adapting existing ductwork to achieve the required airflow distribution. Finally, we carried out full airflow testing and balancing to confirm the system is operating efficiently and compliantly, providing a comfortable environment for the new office workspace.
Another great job completed
Request a free quotation
Fast response from our specialist team

