A new engine test cell block was required by the client, incorporating balanced ventilation, temperature and humidity control, and a dedicated engine Combustion and Exhaust system.
3-New air-handling units (AHUs) were installed on the roof, each housing EC Plug fans, Thermal Wheels, DX coils and Dehumidifiers. These were connected to large ductwork plenum boxes and external ductwork runs which penetrated the roof and routed into the plant room, and through to high level Supply and Extract Ventilation Grilles. This ensured a balanced Ventilation air change rate with climate control for each of the test cells.
In addition, separate stainless-steel combustion air and engine exhaust fan units, along with associated ductwork, were installed on the roof. These systems delivered dedicated local Combustion air to each test cell and Exhausted air directly from the engines. The exhaust fan units were fitted with specialised air-filter scrubbers to clean the dirty air before discharge to atmosphere at high level.
Request a free quotation
Fast response from our specialist team